Hi,
I have a date field defined as dd/MM/yyyy. When the value entered is '20/05/07', the value is accepted and the date is stored as '20/05/1907' ie the century details are defaulted to '19'.
- Should the value '20/05/07' be treated as valid, even though the format specified dd/MM/yyyy?
- And is it possible to modify any AwareIM configuration parameter to specify the default century used in dates as '20' (not '19')?
Thanks
Date century default
-
- Posts: 7525
- Joined: Sun Apr 24, 2005 12:36 am
- Contact: